EV Charger on Your Driveway: Do You Need Planning Permission in 2026?

Since 29 May 2025, installing an EV charge point on your own driveway in England has become considerably simpler - a genuine change worth knowing about if you're planning a new driveway or adding a charger to an existing one.

The current rule

Homeowners with off-street parking in England can now install a domestic EV charge point under permitted development rights, without needing a planning application in most cases - a change from the previous rules, which required an application in some circumstances. This removed both the delay and the £258 application fee that used to apply.

The conditions that still apply

  • A wall-mounted charger must not exceed 0.2 cubic metres in volume
  • A free-standing pedestal charger must not exceed 2.3 metres in height
  • If your property is listed, or in a conservation area, you should check with your local council before installing - the general permitted development right doesn't automatically apply

What's still required regardless

Permitted development covers planning permission specifically - it doesn't remove the need for Building Regulations compliance. Installation must still be carried out by a qualified electrician, comply with Building Regulations Part P (electrical safety), and typically be certified through a registered competent person scheme.

Planning the charger alongside a new driveway

If you're having a driveway laid and plan to add a charger at the same time or later, it's worth deciding on cable routing and charger position before the surface goes down - retrofitting ducting under a finished block paving or resin driveway is a considerably bigger job than including it during the original build.

What this means for a typical Essex or East London home

For most standard semi-detached and terraced properties with off-street parking, this means a charger can now be added to a driveway project with minimal extra admin - a genuine improvement over the process homeowners faced installing chargers just a couple of years ago.

Planning a driveway with an EV charger in mind?

Get free quotes from local contractors who can plan cable routing into the design from the start.

Get my free quotes →

Frequently asked questions

Do I need planning permission for an EV charger on my driveway?

In most cases no, since 29 May 2025 homeowners with off-street parking in England can install one under permitted development rights, without a planning application.

Are there size limits on the charger?

Yes - a wall-mounted charger must not exceed 0.2 cubic metres in volume, and a free-standing pedestal charger must not exceed 2.3 metres in height.

Does permitted development remove the need for Building Regulations?

No, Building Regulations approval and compliance with Part P for electrical safety are still required regardless of the planning permission position.