Since 29 May 2025, installing an EV charge point on your own driveway in England has become considerably simpler - a genuine change worth knowing about if you're planning a new driveway or adding a charger to an existing one.
The current rule
Homeowners with off-street parking in England can now install a domestic EV charge point under permitted development rights, without needing a planning application in most cases - a change from the previous rules, which required an application in some circumstances. This removed both the delay and the £258 application fee that used to apply.
The conditions that still apply
- A wall-mounted charger must not exceed 0.2 cubic metres in volume
- A free-standing pedestal charger must not exceed 2.3 metres in height
- If your property is listed, or in a conservation area, you should check with your local council before installing - the general permitted development right doesn't automatically apply
What's still required regardless
Permitted development covers planning permission specifically - it doesn't remove the need for Building Regulations compliance. Installation must still be carried out by a qualified electrician, comply with Building Regulations Part P (electrical safety), and typically be certified through a registered competent person scheme.
Planning the charger alongside a new driveway
If you're having a driveway laid and plan to add a charger at the same time or later, it's worth deciding on cable routing and charger position before the surface goes down - retrofitting ducting under a finished block paving or resin driveway is a considerably bigger job than including it during the original build.
What this means for a typical Essex or East London home
For most standard semi-detached and terraced properties with off-street parking, this means a charger can now be added to a driveway project with minimal extra admin - a genuine improvement over the process homeowners faced installing chargers just a couple of years ago.
Planning a driveway with an EV charger in mind?
Get free quotes from local contractors who can plan cable routing into the design from the start.
Get my free quotes →Frequently asked questions
Do I need planning permission for an EV charger on my driveway?
In most cases no, since 29 May 2025 homeowners with off-street parking in England can install one under permitted development rights, without a planning application.
Are there size limits on the charger?
Yes - a wall-mounted charger must not exceed 0.2 cubic metres in volume, and a free-standing pedestal charger must not exceed 2.3 metres in height.
Does permitted development remove the need for Building Regulations?
No, Building Regulations approval and compliance with Part P for electrical safety are still required regardless of the planning permission position.